Editing Guide to construction
Revision as of 09:11, 1 June 2019 by imported>Angust ("APC must be connected ''through a terminal'' (meaning you connect the terminal to the powernet)," <- what the hell does that mean? Changed it. Made all "machines" clickable. Corrected info about connecting machines. APC clarifications.)
Warning: You are editing an out-of-date revision of this page.
If you publish it, any changes made since this revision will be lost.
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
Retrieved from "http://vmstation.net/wiki/Guide_to_construction"